Project schedule & cost Monte Carlo

Native CPM + Monte Carlo engine β€” the model a desktop MS-Project add-in will feed. Durations and lags are in working days (per the work-week calendar); dependencies support the four link types with lag (e.g. D:SS+5, C:FF-2), plus task constraints and deadlines. Edit the tasks, costs and risk register, then simulate.

Deterministic finishMay 9, 2025
Deterministic cost49,500
Percentiles
Hover help

Joint confidence level β€” target convergence

Pick a probability of meeting BOTH the finish date and the budget together. iziRisk iteratively raises both targets over the last simulation’s joint distribution until that joint confidence is reached β€” giving you the date and budget to commit.

Tasks & durations

NamePredsmin Β· ml Β· maxdistConstraintDeadline
A
B
D
C
E

Cost elements

TaskFixed (minΒ·mlΒ·max)Var/day (minΒ·mlΒ·max)

Risk register β€” frequency βŠ› severity (convoluted)

OnNameScopeTaskFrequencyDelay (minΒ·mlΒ·max)Cost (minΒ·mlΒ·max)Shared causeMitigation
β€”β€”
β€”β€”
β€”β€”

Correlated inputs β€” bands that move together

Two estimates made the same way by the same team, or two rates driven by one market, do not move independently. Pair them and say how strongly (βˆ’1 to 1). A band in no pair is drawn exactly as before.